Petrokimia Gresik — AMUR II Project

Heavy lift and erection for the ammonium urea plant (AMUR II) at the Petrokimia Gresik complex, October 2016.

2016-10Project Cargo
Petrokimia Gresik — AMUR II Project — Project Photo

01The Challenge

The AMUR II project required the installation of large reactors and distillation columns in a dense plant area with limited access. Several components weighed over 100 tons and needed to be lifted to significant heights between existing structures.

02Our Solution

GIS deployed high-capacity hydraulic cranes with detailed rigging plans. The engineering team prepared specific method statements for each lift, including load simulation and soil analysis. Operations were executed in phases with tight coordination with the EPC contractor.

03The Results

  • All components installed according to project schedule
  • Zero incidents during heavy lift operations
  • Effective coordination with EPC contractor and plant owner